Capital Development Authority Islamabad: (CDA) Major Projects Completed In Last Five Years



  • (CDA) Capital Development Authority Islamabad Pakistan, is not only known for its natural beauty but also for its continuous urban development initiatives aimed at enhancing the quality of life for its residents. In recent years, Islamabad has witnessed a series of ambitious projects, ranging from the construction of modern road networks to the rehabilitation of sewerage systems, and the development of pedestrian-friendly infrastructure. These endeavors are part of a larger vision to transform Islamabad into a modern and efficient metropolis that caters to the growing needs of its residents and visitors. In this blog, we'll take you on a journey through the significant urban development projects that are shaping the future of Islamabad, making it a model city in the region.


  • Here is a list of projects completed by the Capital Development Authority (CDA) in Islamabad.
     

  • 1. Widening & Improvement of Kashmir Highway (South Carriageway Section-I)
  • Location: From Peshawar More to Golra More, Islamabad
  • Project Cost: 1.649 Billion PKR
     
  • 2. Construction of Pak Day Parade Ground
  • Location: Exhibition Road, Islamabad
  • Project Cost: 0.600 Billion PKR
     
  • 3. Development of Signal-Free & Controlled Access Corridor of Islamabad Highway
  • Location: From Zero Point to Faizabad Interchange, including construction of interchange at I-8 intersection, Islamabad
  • Project Cost: 1.578 Billion PKR
     
  • 4. Addition of 3rd & 4th Lane to Kashmir Highway (Section-2)
  • Location: From Peshawar More to Golra, Islamabad
  • Project Cost: 1.700 Billion PKR
     
  • 5. Flyover Project at the Intersection of Faisal Avenue/Jinnah Avenue
  • Location: Islamabad
  • Project Cost: 1.329 Billion PKR
     
  • 6. Zero Point Interchange (Substantially Completed)
  • Location: Islamabad
  • Project Cost: 3.750 Billion PKR
     
  • 7. 7th Avenue, Including 5 No. Underpasses
  • Location: Islamabad
  • Project Cost: 1.100 Billion PKR
     
  • 8. Dualization of Lathrar Road
  • Location: Islamabad
  • Project Cost: 1.045 Billion PKR
     
  • 9. 9th Ave (Phase-II) with 3 No. Underpasses
  • Location: Islamabad
  • Project Cost: 1.750 Billion PKR
     
  • 10. Underpasses at Shaheed-i-Millet Road
  • Location: Islamabad
  • Project Cost: 0.950 Billion PKR
     
  • 11. Development of Saidpur Village
  • Location: Islamabad
  • Project Cost: 0.397 Billion PKR
     
  • 12. Lake View Park (Phase-I)
  • Location: Islamabad
  • Project Cost: 0.308 Billion PKR
     
  • 13. Development of Infrastructure in Sector I-14
  • Location: Islamabad
  • Project Cost: 0.352 Billion PKR
     
  • 14. Development of Infrastructure in Sector I-16 (Roads, Drainage)
  • Location: Islamabad
  • Project Cost: 0.675 Billion PKR
     
  • 15. Development Work for Fruit & Vegetable Market I-11
  • Location: Islamabad
  • Project Cost: 0.535 Billion PKR
     
  • 16. Development Work in H-11
  • Location: Islamabad
  • Project Cost: 0.650 Billion PKR
     
  • 17. Development of Infrastructure in G-13 (Deposit Work)
  • Location: Islamabad
  • Project Cost: 0.719 Billion PKR
     
  • 18. Construction of Wafaqi Mohtesib Building
  • Location: Islamabad
  • Project Cost: 0.275 Billion PKR
     
  • 19. Arts & Crafts Village
  • Location: Islamabad
  • Project Cost: 0.300 Billion PKR
     
  • 20. Development of Markets and Class-III Shopping Centers
  • Location: Islamabad
  • Project Cost: 0.083 Billion PKR


  • 21. Completion of Various Security Measures
  • Location: Islamabad
  • Project Cost: 0.560 Billion PKR
     
  • 22. Improvement of Roads and Drainage System
  • Location: Islamabad
  • Project Cost: 3.460 Billion PKR
     
  • 23. Improvement of Footpaths and Kerb Stones
  • Location: Islamabad
  • Project Cost: 0.076 Billion PKR
     
  • 24. Re-carpeting of Roads
  • Location: Islamabad
  • Project Cost: 0.093 Billion PKR
     
  • 25. Road Signage Work and Lane Marking
  • Location: Islamabad
  • Project Cost: 0.240 Billion PKR
     
  • 26. Construction of Speaker National Assembly House
  • Location: Islamabad
  • Project Cost: 0.077 Billion PKR
     
  • 27. Construction of Administration Block ICT Complex in G-11/4
  • Location: Islamabad
  • Project Cost: 0.121 Billion PKR
     
  • 28. Development of Infrastructure in Sector G-13
  • Location: Islamabad
  • Project Cost: 0.720 Billion PKR
     
  • 29. Construction of Horse Stable and Barrack in H-11
  • Location: Islamabad
  • Project Cost: 0.035 Billion PKR
     
  • 30. Construction of Culvert I&T Center G-9/1
  • Location: Islamabad
  • Project Cost: 0.020 Billion PKR
     
  • 31. Rehabilitation of Approach Road to Federal Lodges and Family Suits G-5/1
  • Location: Islamabad
  • Project Cost: 0.009 Billion PKR
     
  • 32. Construction of 2 No police barracks in G-9 and G-10
  • Location: Islamabad
  • Project Cost: 0.042 Billion PKR
     
  • 33. P/L Lane Marking & Cat Eyes in F&G Series (RRC) Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR
     
  • 34. Construction of Service Road (South), H-11, Islamabad (Remaining Portion)
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 35. Rehabilitation of Chistiabad Road, Street 69, Sector I-14/4. Repair Maintenance of Damaged Portion of VR-I Sector I-14/3, Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 36. Construction of Remaining Portion of Service Road (South) Sector I-16/4, Islamabad. (Risk & Cost)
  • Location: Islamabad
  • Project Cost: 0.193 Billion PKR
     
  • 37. Provision of 32 lifts in Pak Secretariat
  • Location: Islamabad
  • Project Cost: 0.154 Billion PKR
     
  • 38. Construction of interchange at Karal Intersection on Islamabad Expressway
  • Location: Islamabad
  • Project Cost: 0.776 Billion PKR
     
  • 39. Construction of 2nd Carriageway from round about of Service Road (West) Sector G-10 to Khayaban-e-Iqbal, Islamabad
  • Location: Islamabad
  • Project Cost: 0.236 Billion PKR
     
  • 40. Dualization of Service Road (East) & (North) of Sector E-11 to Sector D-12, Islamabad
  • Location: Islamabad
  • Project Cost: 0.179 Billion PKR

  • 41. Rehabilitation and re-carpeting of various roads in sectors of F&G series Islamabad
  • Location: Islamabad
  • Project Cost: 0.845 Billion PKR
     
  • 42. Improvement of Lane Marking for sectors F&G series, Islamabad
  • Location: Islamabad
  • Project Cost: 0.068 Billion PKR
     
  • 43. Addition of three lanes on Kashmir Highway
  • Location: Islamabad
  • Project Cost: 3.526 Billion PKR
     
  • 44. Construction of Bridge and Allied works in I-15/I-16
  • Location: Islamabad
  • Project Cost: 0.080 Billion PKR
     
  • 45. Dualization of SR (North) I-10/I-11
  • Location: Islamabad
  • Project Cost: 0.071 Billion PKR
     
  • 46. Construction of Bari Imam Complex
  • Location: Islamabad
  • Project Cost: 0.256 Billion PKR
     
  • 47. Construction of ICT Admin Block (I.G Block) in G-11
  • Location: Islamabad
  • Project Cost: 0.255 Billion PKR
     
  • 48. Construction of SSP houses in H-11
  • Location: Islamabad
  • Project Cost: 0.086 Billion PKR
     
  • 49. Development of walk-in Aviary at Lake View Park
  • Location: Islamabad
  • Project Cost: 0.079 Billion PKR
     
  • 50. Construction of an entertainment hub at Lake View Park
  • Location: Islamabad
  • Project Cost: 0.079 Billion PKR
     
  • 51. Construction of 02 No police barracks in F-7, F-8
  • Location: Islamabad
  • Project Cost: 0.042 Billion PKR
     
  • 52. Construction of Houses and sports complex in Police Academy H-11 (Balance work)
  • Location: Islamabad
  • Project Cost: 0.094 Billion PKR
     
  • 53. Construction of Auditorium in Police Academy (Balance work)
  • Location: Islamabad
  • Project Cost: 0.079 Billion PKR
     
  • 54. Development works in Sector D-12
  • Location: Islamabad
  • Project Cost: 0.864 Billion PKR
     
  • 55. Construction of 2nd hanger for Heliport
  • Location: Islamabad
  • Project Cost: 0.316 Billion PKR
     
  • 56. Cost of police barracks Diplomatic Enclave
  • Location: Islamabad
  • Project Cost: 0.021 Billion PKR
     
  • 57. SIS and AVC system in Senate Hall
  • Location: Islamabad
  • Project Cost: 0.063 Billion PKR
     
  • 58. Street lights in Sector G-13
  • Location: Islamabad
  • Project Cost: 0.090 Billion PKR
     
  • 59. Construction of bridge in I&T Center G-9/4
  • Location: Islamabad
  • Project Cost: 0.065 Billion PKR
     
  • 60. Improvement of Ahmedia Graveyard, Sector H-9
  • Location: Islamabad
  • Project Cost: 0.009 Billion PKR

  • 61. Construction of Club House in sector F-6 Markaz, Islamabad
  • Location: Islamabad
  • Project Cost: 0.069 Billion PKR
     
  • 62. Dualization of Service Road East & North of Sector E-11 to Sector D-12, Islamabad (Physical Progress: 49%)
  • Location: Islamabad
  • Project Cost: 0.179 Billion PKR
     
  • 63. Construction of Citizen Club at Fatima Jinnah Park, F-9, Islamabad
  • Location: Islamabad
  • Project Cost: 1.254 Billion PKR
     
  • 64. Replacement of 15'' dia sewerage lines from M.H 03 to 0-E in front of USA Embassy and 230 mm dia sewerage line from UAE embassy to Brazil Embassy M.H 102 to M.H 111, in Diplomatic Enclave Area, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 65. Rehabilitation of Sewerage line from COMSATS Building to Ex-US Aid Building and along Supreme Court Bar Building in Sector G-5, Islamabad
  • Location: Islamabad
  • Project Cost: 0.004 Billion PKR
     
  • 66. Replacement of damaged sewerage line from Cabinet Division to National Assembly and repair / raising of manhole in Sector G-5, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 67. Rehabilitation of sewerage line from Nusrat Hostel to Street # 08, Sector G-6/3 and Food Street in G-6 Markaz, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 68. P/L 9" dia sewerage line from Agha Khan Road to Street # 56, Abbas Market and Street # 53 to 54 in sector F-6/4, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 69. Rehabilitation of sewerage line from Buland Markaz to MCB in Blue area along Jinnah Avenue, Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 70. Rehabilitation of defective & damaged sewerage lines along SP Office, G-10 Markaz, Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 71. Rehabilitation of sewerage line from CDA Colony to street # 18 and repair of trunk sewer line in nullah in sector I-10/1, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 72. Rehabilitation of damaged portion of sewerage line near Masjid and laying of sewerage line from Mecho Plaza to Metro Cash & Carry, Sector I-11, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 73. Rehabilitation of damaged sewerage line from Street # 06 to main trunk sewer line (Pakistan Sweet Home) and from PTCL Building to SR (West), Sector H-9, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 74. Repairing / Raising of manholes slab and clearing of chocked sewerage lines at various locations in sector G-6/F-6 and Diplomatic Enclave Area, Islamabad (Petty works)
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 75. Rehabilitation of sewerage line from Street # 6 to 4, Kohsar Market to St # 10 in sector F-6/3 and Street # 22 to 23 in sector F-6/2, Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR
     
  • 76. Re-habilitation of sewerage lines St No. 01 to Gomel road Street No. 05, 04 and Shaheen Market in Sector E-7 Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR
     
  • 77. Rehabilitation of sewerage line from Margalla road to service road west in sector F-8/2 Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 78. Rehabilitation of trunk sewer line along NDR, 74% Dawn News (Zero point) Street # 33 and portion of 70% trunk sewer line near Park in sector G-7/1, Islamabad
  • Location: Islamabad
  • Project Cost: 0.003 Billion PKR
     
  • 79. Rehabilitation of sewerage line street No. 16 Block No 27-A & 28-A in sector G-8/1 and Jhelum road in sector G-8/4 Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR
     
  • 80. Rehabilitation of trunk sewer line on Ravi road H. No 310 to 343 in sector G-8/2, Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR


  • 81. Rehabilitation of sewerage line from M. H. # 36 to 64 and Bela road, in Sector G-10/1, Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR
     
  • 82. Rehabilitation of defective sewerage lines at Gali No. 44 to 42, in Sector G-10/4, Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 83. Rehabilitation of sewerage line along Crescent Plaza, Faysal Bank and Malik Plaza including repair of damaged manholes in F-10 markaz, Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 84. Rehabilitation of sewerage line exchange to major road in F-11 markaz and street # 39, sector F-11/3, Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 85. Rehabilitation of damaged sewerage line at VR-5 in I-8 markaz and street No. 69 & 53, in Sector I-8/3, Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR
     
  • 86. Up-Gradation / Rehabilitation of Fencing in Supreme Court Judges Enclave F-5 Islamabad
  • Location: Islamabad
  • Project Cost: 0.004 Billion PKR
     
  • 87. Rehabilitation/Improvement of Drainage system in Sectors of F&G Series Islamabad
  • Location: Islamabad
  • Project Cost: 0.027 Billion PKR
     
  • 88. Construction and rehabilitation of footpaths in sectors F&G Series Islamabad
  • Location: Islamabad
  • Project Cost: 0.056 Billion PKR
     
  • 89. Rehabilitation/Improvement of Signage & Painting of Kerb Stones of various sectors of F&G Series Islamabad
  • Location: Islamabad
  • Project Cost: 0.023 Billion PKR
     
  • 90. Construction of External Infrastructure in Sector H-10 (IIUI), Islamabad
  • Location: Islamabad
  • Project Cost: 0.070 Billion PKR
     
  • 91. Rehabilitation of MR-II, NESCOM to I.J Principle Road, Sector I-11, Islamabad
  • Location: Islamabad
  • Project Cost: 0.020 Billion PKR
     
  • 92. Development Works/VRs in Sector I-11/1. (Vacated from Kachi Abadi), Islamabad
  • Location: Islamabad
  • Project Cost: 0.008 Billion PKR
     
  • 93. Rehabilitation of Approach Road from G.T Road to Hajj Complex, Sector I-14, Islamabad
  • Location: Islamabad
  • Project Cost: 0.001 Billion PKR
     
  • 94. Construction of 3 Nos Remaining VRs in Sector I-16, Islamabad
  • Location: Islamabad
  • Project Cost: 0.000 Billion PKR
     
  • 95. Rehabilitation of damaged sewerage line St. 10 Plot No. 47 to 86 Sector I-9/2 & 3, Islamabad
  • Location: Islamabad
  • Project Cost: 0.002 Billion PKR
     
  • 96. Development of Sector D-12, Islamabad
  • Location: Islamabad
  • Project Cost: 2.628 Billion PKR
     
  • 97. Dualization of SR East and North Sector E-11
  • Location: Islamabad
  • Project Cost: 0.274 Billion PKR
     
  • 98. Pedestrian Bridges at various locations on Avenues
  • Location: Islamabad
  • Project Cost: 0.150 Billion PKR
     
  • 99. Construction of AGPR Flats
  • Location: Islamabad
  • Project Cost: 0.060 Billion PKR
     
  • 100. Dualization of SR (West) G-10/2 (Leftover portion)
  • Location: Islamabad
  • 101. Improvement of Market and Markaz
  • Location: Islamabad
  • Project Cost: 0.064 Billion PKR


  • 102. Improvement of footpaths and car park
  • Location: Islamabad
  • Project Cost: 0.148 Billion PKR
     
  • 103. Improvement of Roads and Drainage
  • Location: Islamabad
  • Project Cost: 0.250 Billion PKR
     
  • 104. Road Signage Work
  • Location: Islamabad
  • Project Cost: 0.013 Billion PKR
     
  • 105. Rehabilitation of Service Road (West) of G-11 Islamabad
  • Location: Islamabad
  • Project Cost: 0.170 Billion PKR
     
  • 106. Construction of an underpass on Faisal Avenue between sectors G-7 & G-8, Islamabad.
  • Location: Islamabad
  • Project Cost: 0.420 Billion PKR
     
  • 107. Providing & installation of Roads light poles & lights at Rawal Lake View Park Phase-II, Islamabad
  • Location: Islamabad
  • Project Cost: 0.050 Billion PKR
     
  • 108. P/F Railing along Rawal Lake Phase-II, Islamabad
  • Location: Islamabad
  • Project Cost: 0.005 Billion PKR
     
  • 109. Dualization of Atta Turk (West) Embassy road from Khayaban-e-Suharwardy to Khayaban-e-Margalla, Islamabad
  • Location: Islamabad
  • Project Cost: 0.300 Billion PKR
     
  • 110. Construction of Bridge in I&T Center G-10/4, Islamabad
  • Location: Islamabad
  • Project Cost: 0.081 Billion PKR
     
  • 111. Construction of an approach road from gate No.03 of P.M Office to Helipad of Aiwan-e-Sadr G-5, Islamabad
  • Location: Islamabad
  • Project Cost: 0.050 Billion PKR
     
  • 112. Construction of an approach road from Supreme Court Bar Association building to Constitution Avenue, Islamabad
  • Location: Islamabad
  • Project Cost: 0.040 Billion PKR
     
  • 113. Construction of overhead pedestrian bridges at various locations in Islamabad
  • Location: Islamabad
  • Project Cost: 0.400 Billion PKR
     
  • 114. Rehabilitation of the Link Road from I-14 to I-16, Islamabad.
  • Location: Islamabad
  • Project Cost: 0.080 Billion PKR
     
  • 115. Construction of a Boundary Wall (Remaining Portion) around Graveyard area in Sector H-11, Islamabad.
  • Location: Islamabad
  • Project Cost: 0.030 Billion PKR
     
  • 116. Construction of Service Road (South) in Sector I-14, Islamabad.
  • Location: Islamabad
  • Project Cost: 0.030 Billion PKR
     
  • 117. Construction of Service Road (North) in Sector I-14, Islamabad.
  • Location: Islamabad
  • Project Cost: 0.030 Billion PKR
     
  • 118. Rehabilitation and Re-carpeting of Internal Streets in Sectors G-Series (G-6, G-7 & Blue Area, G-8, G-9, G-10 & G-11) Islamabad.
  • Location: Islamabad
  • Project Cost: 0.077 Billion PKR
     
  • 119. Rehabilitation and Re-carpeting of Internal Streets in Sectors F-Series (F-5, F-6, F-7, F-8, F-10, F-11 & E-7) Islamabad.
  • Location: Islamabad
  • Project Cost: 0.931 Billion PKR


  • In conclusion

  • The list of projects presented here represents a comprehensive overview of various development and infrastructure initiatives undertaken in Islamabad, Pakistan. These projects span a wide range of areas, including road construction and improvement, sewerage system rehabilitation, pedestrian infrastructure, and public facilities. The government's commitment to enhancing the quality of life in the capital city is evident through these substantial investments in urban development.
     
  • These projects not only address the immediate infrastructure needs but also contribute to the overall urban planning and modernization of Islamabad. The focus on improving roads, drainage systems, pedestrian facilities, and other essential infrastructure elements is crucial for the city's sustainable growth and the well-being of its residents.
     
  • It is important to note that these projects are part of a broader vision for Islamabad's development and are vital for maintaining the city's status as the capital of Pakistan. As they are completed, they will undoubtedly have a positive impact on the quality of life, transportation, and overall urban experience for the citizens of Islamabad.
     
  • These endeavors reflect the government's dedication to creating a more livable and efficient city while addressing the evolving needs of the population. As these projects continue to progress, they will play a crucial role in shaping the future of Islamabad, making it a more vibrant and modern capital city for generations to come.
     

 